Cube Consulting have estimated the following local recoverable mineral resources at a nominal 1 g/t Au lower cutoff (as at end February 2008):
|
Deposit |
Indicated Mineral Resources |
Inferred Mineral Resources |
||||
|
Tonnes (Mt) |
Grade ( g/t) |
Gold ( ‘000 oz) |
Tonnes (Mt) |
Grade (g/t) |
Gold (‘000 oz) |
|
|
Pakaka |
17.20 |
2.7 |
1,468 |
|
|
|
|
Gorumbwa |
|
|
|
8.29 |
5.2 |
1,374 |
|
Kibali |
|
|
|
17.08 |
2.2 |
1,206 |
|
Mengu Hill |
6.57 |
3.4 |
720 |
0.16 |
2.4 |
13 |
|
|
1.36 |
1.8 |
77 |
|
|
|
|
Karagba |
8.84 |
3.0 |
856 |
27.88 |
3.8 |
3,415 |
|
Chauffeur |
31.88 |
3.4 |
3,524 |
11.85 |
6.5 |
2,478 |
|
Durba |
2.56 |
4.3 |
358 |
8.40 |
2.9 |
781 |
|
Sessenge Deeps |
10.62 |
6.2 |
2,120 |
10.51 |
3.7 |
1,242 |
|
Megi |
|
|
|
4.14 |
2.1 |
277 |
|
Marakeke |
|
|
|
2.41 |
1.7 |
134 |
|
Kombokolo |
1.91 |
2.6 |
162 |
0.05 |
2.7 |
4 |
|
Sessenge |
8.72 |
2.4 |
666 |
0.88 |
2.2 |
63 |
|
Ndala |
|
|
|
0.26 |
4.0 |
34 |
|
Pamao |
5.62 |
1.9 |
347 |
4.58 |
1.8 |
268 |
|
TOTAL |
95.28 |
3.4 |
10,298 |
96.50 |
3.6 |
11,289 |
MGL has a 70% attributable interest.
|
|
Probable Mineral Reserves |
||
|
Deposit
|
Tonnes
(Mt)
|
Grade (g/t)
|
Gold
(‘000 oz Au) |
|
KCD
|
19.0
|
3.61
|
2,201
|
|
Kombokolo
|
0.7
|
3.58
|
81
|
|
Mengu Hill
|
4.4
|
3.72
|
525
|
|
Pakaka
|
7.1
|
2.77
|
631
|
|
Pamao
|
2.2
|
2.09
|
149
|
|
Sessenge
|
4.3
|
2.51
|
349
|
|
Mengu Village
|
0.1
|
2.12
|
8
|
|
Total
|
37.8
|
3.24
|
3,939
|
The following probable mineral reserves were estimated as part of the December 2007 feasibility study.
MGL has a 70% attributable interest.






